Tuesday 23 June 2015

Rose of Sharon

The project 'Rose of Sharon' includes the planning and execution of a 14 - story apartment towers with underground parking, a 4-storey office building the function and several buildings and their infrastructure in an exclusive location in the metropolis of Lagos.see more photo after the cut..
JBN is the turnkey construction projects for a Nigerian investor through a construction period of about three years. The entire Complex includes approximately 54,000 m³ of enclosed space. This project is our pilot project in model-based processing. Different ne aspects of model-based editing, we tested an example. Shell and expansion we have already modeled for the offer with Revit 2010 and iTWO edited. In the offer phase could determine the quantity, with many planning tion changes, offer advantages. Due to the limited land ratios we conducted a construction process simulation with schedule optimization. In the jetzi- tions execution phase we have the quantity determination for controlling con- fits. The volume tracking is possible in different variants. A visually performance-based message in the shell we have developed

No comments:

Post a Comment